LanCo Construction & Remodeling builds new single-family homes in St. Petersburg, Gulfport, Seminole, Largo and the Pinellas beach communities. We build two kinds: homes on standard lots that do not have to be elevated, and elevated homes on flood-zone lots. LanCo is a family-owned Florida licensed contractor (CBC1255870) and has been building in Pinellas County since 1986.

New home construction project in St. Petersburg, FL by LanCo Construction

What does it cost to build a new home in Pinellas County?

In 2026, a new LanCo home that does not have to be elevated typically runs $400 to $600 per square foot of living area. A new elevated home in a flood zone typically runs $550 to $750 per square foot of living area. Both ranges are for construction and do not include the land.

Type of new homeTypical 2026 priceMeasured on
Home on a standard lot (not elevated)$400–$600 per sq ftAir-conditioned living area
Elevated home on a flood-zone lot$550–$750 per sq ftAir-conditioned living area

Every LanCo price comes from a written proposal prepared after we have seen the lot and the plans. The proposal price includes the building permit, site work, and listed allowances for cabinets, countertops, tile, flooring and plumbing fixtures. High-end finishes, pools and unusual site conditions run above these ranges.

“Living area” means the air-conditioned space. Garages, porches and balconies add cost without adding living area, which is why an elevated home with a full garage level underneath costs more per square foot of living area than a single-story home on a slab.

Building a home that does not have to be elevated

If your lot is outside the special flood hazard area (shown as Zone X on the FEMA flood map), the home can usually be built on a conventional slab at ground level. That means no garage level under the house, no elevator, and a simpler foundation. It is the most cost-effective way to build new in Pinellas County.

A typical LanCo home of this kind is concrete block on a slab, with impact-rated windows and doors and a roof system tied down to current Florida Building Code wind requirements. We build single-story and two-story plans, with or without an attached garage, and can add a detached garage or an accessory dwelling unit on lots that allow one.

Building an elevated home in a flood zone

On a flood-zone lot, the living floor has to sit above the required flood elevation. We build these homes from the ground up: a block ground level for parking and storage, with the living floors framed above it. Many of our elevated homes include an elevator.

Elevated homes cost more per square foot for three reasons: the foundation is heavier, there is a full level under the house that is not living area, and stairs, elevators and balconies add structure. Our flood-zone construction guide explains the rules in plain language.

LanCo builds new elevated homes. We do not lift existing houses.

What moves the price up or down?

  • Finish level. Cabinets, countertops, tile, flooring and fixtures are the most common upgrades.
  • Foundation and site. Piles cost more than a standard footing. Demolishing an existing house adds cost.
  • Porches, balconies and garages. They add to the price without adding living area.
  • Size. Smaller homes cost more per square foot than larger ones, because the kitchen, baths and permits do not shrink with the footprint.
  • Elevators, pools and outdoor kitchens. Each is priced as its own line.

How long does it take?

A single-story home on a standard lot typically takes 10 to 12 months from the day the permit is issued. An elevated home typically takes 12 to 16 months from permit. Permit review comes first and its length is set by the city or county.

How the process works

  1. Lot and plan review. We look at your lot, your survey and your plans, or connect you with a designer if you do not have plans yet.
  2. Written proposal. You get a detailed scope and a price, with every allowance listed in dollars.
  3. Permitting. We prepare and submit the permit package to the city or county.
  4. Construction. One LanCo project manager runs the job from site work through final inspection.
  5. Closeout. Final inspections, certificate of occupancy and a walkthrough with you.

A few of the new homes we have built

LanCo has built more than 50 new homes in Pinellas County, for individual owners and on our own lots. The homes below are a sample, not a complete list.

On standard lots (not elevated)

  • 19th Street North, St. Petersburg — single-story contemporary home: 3 bedrooms, 2 baths and an office in 1,850 square feet of living area, with an attached two-car garage, a covered lanai and a vaulted living room.
  • Oak Street — single-story home: 4 bedrooms and 2 baths in 1,916 square feet of living area, with an attached two-car garage, covered front and rear porches and 10-foot ceilings.
  • 6th Avenue Northeast, St. Petersburg — two new homes on the same street, including a two-story custom home of about 5,500 square feet of living area with a separate apartment on the property.
  • 53rd Street South, Gulfport — single-story new home.

Elevated homes in flood zones

See more in our portfolio, or view our available inventory.

Frequently Asked Questions

How much does it cost to build a house in St. Petersburg, FL?

In 2026, LanCo’s new homes on standard lots typically run $400 to $600 per square foot of living area, and elevated homes in flood zones typically run $550 to $750. Those figures are for construction only and do not include land. Your exact price comes from a written proposal based on your lot and plans.

Is it cheaper to build on a lot that is not in a flood zone?

Usually, yes. A home that does not have to be elevated can sit on a conventional slab, with no garage level underneath, no elevator and a simpler foundation. At LanCo that difference shows up as roughly $400 to $600 per square foot of living area, compared with $550 to $750 for an elevated home.

How long does it take to build a new home?

A single-story LanCo home on a standard lot typically takes 10 to 12 months from the day the permit is issued. An elevated home typically takes 12 to 16 months from permit. Permit review happens before that and varies by city, so we give you a project-specific schedule with your proposal.

Do I need my own plans?

No. If you have plans from an architect or designer, we will price and build from them. If you do not, we can connect you with a designer and stay involved while the plans are drawn so the house is designed to a budget.

Can you build on a lot I already own?

Yes. We regularly build on the owner’s lot, including lots where an older house has to be removed first. We review the survey, the flood zone and the setbacks before we price anything.

Where does LanCo build new homes?

LanCo builds in St. Petersburg, Gulfport, Seminole, Largo, Treasure Island, Madeira Beach, St. Pete Beach and Redington Shores. Our office is at 5225 4th Street North, Suite G, in St. Petersburg.

Talk to us about your lot

LanCo is a member of NARI Tampa Bay and is BBB accredited with an A+ rating.

Call (727) 533-9515 or request a consultation. Tell us where the lot is and whether you have plans, and we will tell you what kind of home it calls for and what it is likely to cost.